Call Gudzen

About / Austin, Texas

The person who quoted your job is in the room when the plastic goes up.

Gudzen is a small interior finishing contractor in Austin. The same few people strip the room, hang the board, fix the door and walk the punch list with you. Nobody hands your drywall to a stranger.

Who runs this site

A lead and a small crew, working out of Market Street.

This site is run by Gudzen, trading at gudzen.store. It is an interior renovation business: we work inside homes, condos and small commercial units in and around Austin, Texas. The office and workshop is at 73 Market Street, Apt 3, Austin, Texas 03119, United States. That is where the van loads in the morning and where the paperwork gets done at night.

The crew is a lead plus a handful of people who have worked together for several seasons. Same faces on every job. The lead walks the house, writes the scope, and is on site most days of the job, not just the first and last one. If you call the number on this page, you get someone who knows which room you mean.

We are not a design-build firm and we do not pretend to be one. There is no showroom and no sales rep. You talk to the people who will be holding the knives.

Crew raising plastic sheeting on zip-wall poles to seal a doorway before demolition
Fig. 01Kitchen doorway, first hour of the job. Floor board is already taped down on the hardwood, the fan box is in the window, and nothing has been pulled off a wall yet.

The dust-control method

Sealed room first. Hammer second.

Drywall dust is finer than flour and it goes everywhere the air goes. Under the doors, and through the return vent into the bedroom closet at the far end of the house. Most complaints about renovation crews in Austin start there, and most of them are about a job where nobody bothered to seal the room. So the first half-morning of every job is spent building the wall, and we charge for that time openly instead of skipping it.

Here is the order, every time, whether the job is a half-bath strip-out or a whole-floor skim coat.

  1. 01 Floors that stay get Ram Board

    Heavy fibre board rolled out wall to wall on the hardwood, tile or carpet that is not coming up. Seams taped, edges taped to the baseboard. It takes a dropped bucket of mud and a ladder foot without denting the oak underneath.

    Ram Board / seam tape on every joint
  2. 02 Doorways closed with Zip-Wall and 6-mil poly

    Spring-loaded poles hold clear 6-mil plastic tight from floor to ceiling across every opening between the work room and the rest of the house. We add a zippered door so we are not tearing the sheet every trip to the van.

    Zip-Wall poles / 6-mil poly / zip door
  3. 03 Vents and returns taped off

    Supply registers in the room get covered. The HVAC return gets covered too, and we ask you to set the system so it is not pulling air from the work zone. A clogged filter a week later is the tell that someone skipped this.

    Poly and painter's tape / filter check at handover
  4. 04 Negative-air fan in the window on sanding days

    When we sand mud or pull popcorn ceiling, a fan box sits in a window pushing air out. The room runs at slightly lower pressure than the hall, so the plastic bows inward and the dust leaves through the window instead of through the house.

    Fan box sealed in the window frame / runs until wipe-down
  5. 05 Sanders on extractors, not on bags

    Every sander we own plugs into a Festool extractor. Hand sanding is kept to touch-ups. It is slower to set up and it is the single biggest reason the plastic is still clear at the end of the day.

    Festool extractors / HEPA filter class

Plastic goes up before anything comes down.

The first rule on every Gudzen job
  • USG Sheetrock
  • ProForm all-purpose mud
  • Zip-Wall poles
  • Ram Board
  • Festool extractors
  • Paper tape on flat seams
  • Metal bead on corners
  • Contractor bags, 3 mil

A site day, hour by hour

What happens in your house between 7:30 and 5.

People put up with a renovation a lot better when they know when the noise starts and when it stops. So the day runs to a clock. It changes a little on a demo day and a little on a drying day, but this is the shape of it.

  1. 7:30

    Van at the curb, quiet setup

    We park where you told us to, carry in, and check the plastic and floor board from yesterday. Anything that sagged overnight gets re-taped. No saws, no hammers yet.

  2. 8:00

    Loud tools on

    Demo, cutting board, screw guns, the wet saw in the garage. If you work from home and need a quiet hour for a call, tell the lead in the morning and we shift the cutting around it.

  3. 12:00

    Lunch off site

    We eat in the van or down the road, not in your kitchen. Doors to the work room stay zipped.

  4. 12:45

    Afternoon run

    Usually the finishing half: mud coats, trim, hardware. Mud goes on in the afternoon so it has the night to dry. In an Austin August with the AC running, that is about 24 hours a coat, so the next coat waits for tomorrow.

  5. 4:30

    Tools down, clean-up

    Debris bagged and out to the trailer or the dumpster. Floors vacuumed inside the plastic and along the path to the door. Buckets lidded. Nothing sharp left where a kid or a dog can reach it.

  6. 5:00

    The daily note goes out

    A short message by text or email with what got done, what is drying, and what tomorrow looks like. Photos attached when there is something worth seeing behind a wall.

The daily note

Five lines every evening, so you never have to ask.

It is not a report. It is what the lead would tell you if you caught them on the driveway. A typical one, from day three of a hall bathroom and ceiling job, looks like this.

Daily note / Day 3 of 6 Hall bath and ceiling
  • Done: cement board up on the tub walls, seams taped with mesh and thinset. Ceiling patch over the old fan hole screwed off.
  • Drying: first coat of mud on the ceiling seams. Do not touch, it looks dry on top and is not.
  • Found: a soft spot in the subfloor by the toilet flange, about 10 by 14 inches. Photo attached. Needs a new piece of 3/4" ply. We will price it before touching it.
  • Tomorrow: second coat, then board in the closet. Loud from 8 to about 10.
  • From you: a yes or no on the subfloor patch by 7:30.

Notice the fourth line. Anything we find behind a wall that changes the price gets written up and priced before we do it. We do not run a change order on your card and tell you at the end.

Materials and tools

The brands in the van, and why they are there.

The written scope names the materials, so you can check what went into your wall. These are the defaults. If you want something else and it is not worse, we will use it.

USG Sheetrock

1/2" standard / 5/8" Type X / moisture-resistant

Consistent edges and paper that takes mud without blistering. Type X goes where code asks for it, like a garage wall shared with the house.

ProForm joint compound

All-purpose for tape / lite for top coats

All-purpose bedding coat for strength, lighter mud on the finish coats so sanding makes less dust in the first place.

Zip-Wall

Spring poles / zip doors

Holds the plastic tight on a 9-foot ceiling without screws in your trim or tape on your paint.

Ram Board

Floor protection, taped seams

Stiffer than paper or drop cloth. It does not slide under a ladder and it keeps grit from grinding into oak.

Festool extractors

Paired with every sander

Pulls the dust off the pad as it is made. Expensive to own. Cheaper than repainting your hallway.

Cement board and thinset

Behind every tiled wall

Drywall behind a shower is the failure we tear out most. Board, alkali-resistant mesh, thinset. No green board in the wet zone.

Bring us a list and we work down it until the time runs out.

How small repairs are booked

What the business does

Interior remodeling in Austin, in four stages and nothing past them.

Gudzen does interior work only. No roofs, no foundations, no additions, no new builds. Inside the house, the work falls into four stages, and one crew runs all of them so there is no three-week gap waiting for the next trade to turn up.

  • Demolition and strip-out. Tile, vanities, cabinets, drywall, carpet, glued-down vinyl and popcorn ceiling. Debris bagged and hauled, priced per 10-yard load apart from labour.
  • Rough finishing. Drywall installation and finishing: hanging board, cement board behind tile, taping to Level 4 as standard, skim coats to Level 5 as a separate line, patching after plumbers and electricians, and self-levelling underlayment on subfloors.
  • Small repairs. Doors that stick, hinges, strikes, baseboard and casing, caulk and grout, holes, water-stained ceilings, loose tile. Booked by the half day or the day.
  • Finish work and handover. Trim, primer and two coats of paint, hardware, then the punch list walked with you and a final clean before the last invoice.

We turn down structural walls, gas lines, electrical panel upgrades and full kitchen or bath design. Those need an engineer or a licensed trade to sign off, and we say so on the first call and tell you who to ring. The full scope, cure times and pricing basis for each stage are on the services page.

Every figure we give is a pricing basis. The number you can hold us to is the written estimate after a free walk-through.

How to reach a person

Phone, email or the door on Market Street.

Phone
+1 (383) 555-7173
Email
office@gudzen.store
Office
73 Market Street, Apt 3, Austin, Texas 03119, United States
Who answers
The lead or someone from the crew. Not a call centre and not a bot.
When
On working days the phone is picked up between jobs. If we are on a ladder, leave a message and we aim to call back the same working day. Email and form requests are read every evening after the daily notes go out.
Privacy requests
Send them to the same email. How we handle them is in the privacy policy.

Next step

Show us the room and we will tell you what it takes.