Call Gudzen

Services / Austin, Texas

Four interior services, each priced on a basis you can check line by line.

Interior demolition, drywall installation and finishing, small home repairs and the finish work that closes a job. Every room below lists what we use, how long it cures and what is never in the price.

Strip-out

Demolition and strip-out

An interior demolition contractor in Austin that seals the room before the first tile comes off.

Pricing basis

Per sq ft of floor area stripped, plus haul-off per 10-yd load. Confirmed in a written estimate after a walk-through.

Bathroom mid-demolition with wall tile half removed and plastic sealing the doorway
011970s hall bath, day two. Tile off to the mortar bed, doorway sealed on Zip-wall poles, debris bagged at the door.

Bathroom demolition in Austin is most of what we strip. The older ranch houses east of I-35 tend to have tile set on a mortar bed an inch or more thick, sometimes over wire lath. That comes off with a demolition hammer and a flat bar, in chunks, and it is heavy. A 2000s tract home usually has tile on greenboard, which peels off in sheets. Same room size, very different day, and the estimate says which one we found.

We take out tile, vanities, tops, cabinets, drywall and plaster, carpet and pad, glued-down vinyl and laminate, and popcorn ceiling texture once a lab test says it is clean of asbestos. Fixtures that stay, floors outside the work and the door you walk through every day get covered first. Plastic goes up before anything comes down, every time.

Demo is the cheap part of the line. Haul-off is where the money goes, so we price it separately and by the load. A small bathroom fills about one 10-yard load. A kitchen with an island and a tiled backsplash fills two, sometimes three if the floor is tile on a mortar bed too. You see the estimated load count before we start, and the actual count on the invoice.

Materials and setup

Containment
Zip-wall poles, 6-mil poly, zip door
Floor cover
Ram Board, taped seams
Air
Negative-air fan in window
Debris
3-mil contractor bags
Load size
10 yd
Typical bath
1–2 days

In the scope

  • Protection set up before any demo
  • Water shut and lines capped at stops
  • Strip to studs or to sound substrate
  • Nails and old adhesive scraped off
  • Daily sweep and bagging, nothing left overnight

Not in this line

  • Asbestos or lead abatement. That needs a licensed abatement contractor.
  • Load-bearing walls and anything that needs a structural letter.
  • Disconnecting gas ranges or water heaters.
  • 1/2" regular board
  • 5/8" Type X
  • MR board in wet rooms
  • 1/2" cement board
  • Paper tape
  • Level 4 / Level 5
  • Self-levelling underlayment
Board and mud

Rough finishing: drywall, board and levelling

Drywall installation and finishing in Austin, to Level 4 as standard, with the drying time written into the schedule.

Pricing basis

Per sheet hung and finished to Level 4. Skim coat to Level 5 per sq ft of wall, as a separate line.

Two crew members fixing a drywall sheet to the ceiling on a panel lift
02Ceiling sheets go up first, on a panel lift, so the wall sheets hold the edges. Screws every 12 inches in the field on ceilings.

Board goes up after your plumber and electrician finish rough-in and pass inspection, not before. Ceilings first, then walls, sheets run horizontally so there are fewer butt joints at eye level. We use half-inch regular board on most walls, 5/8" Type X on garage walls shared with the house and anywhere else the code asks for fire-rated assembly, and moisture-resistant board in bathrooms and laundry rooms outside the splash zone. Behind tile, it is half-inch cement board, screwed and taped with alkali-resistant mesh. Never greenboard behind a shower.

Taping is paper tape bedded in setting compound on the inside corners and flats, then two coats of lightweight topping, sanded between. Mud needs 24 hours between coats in an Austin August with the AC running. Rush it and it cracks in October. We don't rush it, which is why a bedroom takes four or five working days from bare studs to primer and not two.

Skim coat walls in Austin usually means one of two jobs. Old plaster that has been patched so often it looks like a map, or a Level 5 finish on new board where the light will rake across a flat sheen. Both get a full coat of thinned compound over the whole surface with a wide blade, a day to dry, a second pass, a sand and a primer. It is priced per square foot of wall because it is surface work, not sheet work.

Popcorn ceiling removal sits here too. Once the lab result is clean, we wet the texture, scrape it, skim the ceiling to a flat finish and prime it. Subfloors that dip more than 1/8" over six feet get self-levelling underlayment poured over primer, which needs 24 hours before tile and longer before glued flooring.

Cure and drying times we schedule to
Material Where we use it Before next step
Setting compound Tape bed, deep fills, cement board seams Per bag rating, then 12 h before topping
Lightweight topping Second and third coats on Level 4 24 h between coats
Level 5 skim Full-surface coat over finished board or plaster 24 h per pass, 2 passes
Self-leveller Subfloor dips over 1/8" in 6 ft 24 h before tile
Primer Every new or skimmed surface 4 h before first finish coat

In the scope

  • Board, screws, tape and compound
  • Metal corner bead on outside corners
  • Patching after plumbers and electricians
  • Sanding with extraction, fan in the window

Not in this line

  • Framing changes or moving walls
  • Insulation supply and install
  • Hand-trowelled or Venetian textures

Bring us a list and we work down it until the time runs out.

How small repairs get booked
By the half day

Small repairs

Small home repairs in Austin, booked by time, so twelve small fixes cost the same as three big ones.

Pricing basis

Half-day or full-day crew rate. Materials at cost, with the receipt.

Interior door being rehung with a hinge screw driven in on a drop cloth
03A six-panel door that rubbed the head jamb. Longer screws into the stud at the top hinge usually fix it without a plane.

Most handyman services in Austin, Texas price by the ticket: a fee per door, a fee per hole, a trip charge on top. That makes a list of small things expensive and it makes the crew hurry. We book a half day or a full day instead. You send the list, we tell you roughly how far down it a half day will get, and on the day we work it in the order you choose until the time runs out.

Drywall repair in Austin TX fills a lot of those lists. Doorknob holes, a seam that opened after the summer, nail pops across a ceiling, a water stain from a leak that's already been fixed. Small patches still need 24 hours between coats, so a drywall-heavy list often runs as two short visits, one to fill and one to finish and paint.

We also hang and rehang doors, move strikes, reset hinges, replace baseboard and casing that got kicked in, cut out and renew caulk and grout, relay loose tile, and fix drawers that stick. Materials are bought for your job and billed at cost with the receipt stapled to the invoice. No markup on a tube of caulk.

One honest limit. If something on your list turns out to be a symptom, like a door that sticks because the slab moved, we tell you and leave it rather than shave the door and send you a bill for a fix that won't hold.

Common list items

  • Door hanging, hinges and strikes
  • Drywall holes and nail pops
  • Water-stain ceilings, sealed and repainted
  • Caulk and grout renewal
  • Loose tile, sticking drawers, baseboard

Booking

Half day
4 h on site
Full day
7:30 to 4:30
Materials
At cost, receipt attached
Order
Yours, top of the list first
Not taken
Anything needing a plumbing or electrical permit
  • Primer + 2 coats
  • Paintable caulk
  • Blue tape flags
  • Written punch list
  • Hardware on
  • Vacuum and wipe-down
Finish and walk

Finish work and handover

Trim and baseboard installation in Austin, paint, and a punch list we walk with you before the last invoice.

Pricing basis

Trim per linear ft, paint per room. The handover clean is included in every job.

Hand pointing to a tape flag marking a touch-up during the final punch list walk
04Every blue flag on the walk becomes a line on the written list. The list closes before the invoice goes out.

Baseboard and casing go on after the walls are primed, so the paint line on the wall is already there to caulk to. We cope inside corners on baseboard instead of mitring them, because a coped joint stays closed when the wall moves with the seasons and a mitre opens up. Nails get set and filled, joints get caulked with paintable acrylic, and the trim gets its primer before the finish coats.

Paint is one coat of primer on new or patched surfaces and two finish coats on walls, ceiling and trim of the room. You pick the colour and the sheen. We'll tell you if the sheen you picked will show every roller mark on a Level 4 wall, and what a Level 5 skim would add, before you buy the gallons.

Then the walk. We go room by room with you and a roll of blue tape. Anything you or we see gets a flag and a line on a written punch list: a rough spot, a caulk gap, a hinge screw that isn't flush. Of everything a renovation punch list contractor does, this is the part we won't hurry. The final invoice waits until every line is closed and you've signed the list off.

The plastic comes down last. We vacuum the floors and the Ram Board before we lift it, wipe every sill and ledge, and take every scrap, bucket and screw with us. That clean is in every job and never a separate charge.

Materials

Baseboard
Primed MDF or finger-joint pine
Joints
Coped inside, mitred outside
Caulk
Paintable acrylic
Paint
Primer + 2 coats
Recoat
Per can, often 2–4 h

Not in this line

  • Stain-grade hardwood trim and custom profiles
  • Sprayed cabinet refinishing
  • Exterior paint of any kind
  • Cleaning rooms outside the work area

CallbacksTape seams that open, nail pops and trim that separates are our workmanship, and we come back for them under the callback policy in the terms.

Every service / Every job

Always excluded, and referred to a licensed trade

  • Structural work

    Load-bearing walls, beams, headers over new openings. An engineer specifies them and a framer installs them. We close up once it has passed inspection.

  • Gas

    Ranges, dryers and water heaters on gas are disconnected, capped and reconnected by a licensed plumber. We schedule demo around their visit.

  • Electrical panels and new circuits

    Panel upgrades and any permitted electrical work belong to a licensed electrician. We cut the openings for boxes and patch after they pull wire.

  • Permitted plumbing

    Moving drains or supply lines is a plumber's job. Resetting a toilet on a new floor is ours.

  • Hazardous material abatement

    Popcorn texture or old tile mastic that tests positive for asbestos goes to a licensed abatement contractor first.

Next step / Free in Austin

Get the walk-through, then a written estimate with every line on these bases.

See how a whole job runs on the home page, and who does the work on about.